WaterSolve LLC, was tasked to provide technical assistance for the installation of a Geotube® container dewatering system at an abandoned mine near Huntington, Utah. Two-22.5 ft. circumference by 22-ft. long Geotube® MDS containers, polymer feed systems, and appurtenant piping and fittings were installed to dewater mine drainage residual stored in an onsite holding pond.

DOWNLOAD PDF Applications & ProductsGeotextile Tube Containers, DewateringServicesComplete Solution, Turnkey Project ManagementIndustryMining and Mineral ProcessingLocationUtah, USA

THE TASK

WaterSolve LLC, was tasked to provide technical assistance for the installation of a Geotube® container dewatering system at an abandoned mine near Huntington, Utah. Two-22.5 ft. circumference by 22-ft. long Geotube® MDS containers, polymer feed systems, and appurtenant piping and fittings were installed to dewater mine drainage residual stored in an onsite holding pond.  Randy Wilcox was the on-site representative from WaterSolve, LLC to assist in the installation and start-up.

Geotube® containers (two MDS containers), and polymer (one drum) were on-site when WaterSolve arrived on October 20, 2010.  Dewatering polymer used for this installation was based on the “Dewatering Performance Trial” completed by WaterSolve, LLC on July 21, 2010.

The unconsolidated residual is generated by the chemical treatment of the mine drainage and appears to be iron precipitate.  This residual was chemically conditioned and pumped to the Geotube® container using piping that was installed to remove the solids from the pond.

THE RESULT

The polymer make-down unit was plumbed into the residual line directed toward the Geotube® container.  This unit blends and activates Solve 151 polymer with water and meters it into the injection port.  The existing piping and on-site plumbing was utilized to transport residuals from the pond to the Geotube® container.

The filtrate was directed toward another pond prior to discharge to a watercourse. The residual polymer was a significant concern at this facility.  The materials and equipment to complete the qualitative test to determine the residual polymer were sent to the site prior to our arrival.  We reviewed this testing with on-site personnel.  In addition, we discussed the testing with regulatory agencies that visited the site.  We also met with a local analytical laboratory to discuss the potential of performing the quantitative testing at their facility. When we tested the effluent or Geotube® filtrate for residual polymer using the qualitative method, there was no noticeable polymer present.