Watersolve was contracted to assist in the testing, start-up and optimization of the chemical feed components of the treatment system. The 2011 season was the third for this treatment system designed to remove arsenic and other containments from the water. Since the site was in a remote location all of the equipment, products and supplies were delivered to the site via ice roads or cargo plane. The products provided by WaterSolve included Geotube® containers, filtration fabric, and chemicals.
DOWNLOAD PDF Applications & ProductsGeotextile Tube Containers, DewateringServicesTurnkey Project ManagementIndustryMining and Mineral ProcessingLocation Canada
WaterSolve was contracted to assist in the testing, start-up, and optimization of the chemical feed components of a treatment system designed to remediate water contaminated by heavy metals at an abandoned gold mine in the Northwest Territories of Canada. This was the third season of operation for the treatment system, which focused on removing arsenic and other metals from mine water. The remote location required all equipment, supplies, and personnel to arrive by ice road or cargo plane.
WaterSolve provided Geotube® containers, filtration fabric, and a suite of chemicals. Onsite bench testing was conducted to optimize the use of ferric sulfate, lime, and polymer to precipitate arsenic as a hydroxide, allowing for solids collection in the Geotube® containers.
The containers, made of polypropylene fabric, allowed clean water to escape while retaining solids. Additional testing evaluated sodium metabisulfite to target contaminants like lead and zinc.
Final optimized doses were:
75 ppm Ferric Sulfate
32 ppm Lime
3 ppm Polymer
Further Geotube® Dewatering Tests (GDTs) used similar dosages, adjusting lime based on pH and yielding strong solids capture despite some breakthrough.
Extreme weather conditions delayed system start-up—high winds prevented liner installation on the dewatering pad. The team pivoted to collecting more water samples for laboratory testing to determine sodium metabisulfite dosing for zinc and lead removal. The project’s remote setting posed logistical and operational difficulties. Equipment layout had to be adapted to the terrain, and space was limited. Additionally, optimal Geotube® operation required guidance to avoid exceeding fill heights and releasing solids during tube relaxation. Recommendations included striking the top of tubes with a PVC pipe only when necessary, especially at downstream ends.
With safety training complete, WaterSolve personnel collaborated with the on-site team to start and fine-tune the treatment system. Temporary onion tanks were used for chemical addition, flowing by gravity to the Geotube® containers. Two 45’ circumference by 200’ length Geotube® containers were placed per treatment train. Throughout the week, full-scale operations were established, with solids being collected effectively in the Geotube® containers. WaterSolve also provided analytical support and helped with liner installation.
Key objectives achieved:
Verified chemical conditioning from bench testing
Optimized polymer/flocculent dosage
Assessed floc shear sensitivity
Evaluated impact of lay-flat hose design
Improved flocculent mixing tank performance