This case study outlines WaterSolve’s belt press dewatering project in Michigan for a sugar beet processing facility. Sludge was hydraulically pumped from a narrow pond and processed using a 1.7-meter belt filter press. Due to limited space and resource constraints, customized recirculation and water sourcing solutions were implemented, achieving daily outputs of 60 to 70 cubic yards of dewatered material.
DOWNLOAD PDF Applications & ProductsGeotextile Tube Containers, DewateringServicesPilot Study, Complete Solution, Turnkey Project ManagementIndustryAgricultureLocationMichigan, USA
This Michigan project involved hydraulically pumping sludge from a narrow pond and then mechanically dewater the sludge using belt filter presses due to space restrictions. Then the belt press filtrate water would be returned back to the narrow pond.
The Narrow Pond had settled after the Pilot Study was operated in April; the project started in June. To combat the settling of the water the narrow pond had to be agitated to get a steady amount of sludge using recirculation methods for the belt press to get the desired dewatered material output. The polymer make down water and Belt Press belt wash water had to be sourced from a nearby pond due to the high volume of projects nearby that utilized the company’s city water, making the water pressure insufficient for equipment needs.
WaterSolve was tasked to hydraulically pump sludge from a narrow pond using a 6-inch submersible pump, for a sugar beet processing plan and a 20,000 gallon mix tank to stage the hydraulically pumped sludge. Using a 1.7m belt filter press to mechanically dewater the sludge. WaterSolve would provide all equipment and workforce to dewater the pond and maintain everything for the course of the project. WaterSolve employees would oversee the maintenance of all equipment including the belt press which consists of recording hours of service, performing oil changes for the powered equipment, and applying grease to mechanical parts. The 6-inch submersible pump was hoisted with a 10k Telescopic handler to accurately pump the sludge into the highvolume holding tank. After the sludge was dewatered, the material was staged in a pile nearby where it would be picked up by a front-end loader. The belt press was able to output 60-70 cubic yards of dewatered material per day. The Beltpress filtrate water would run back into the narrow pond using a water booster pump.