In early 2009, engineers were tasked to design a marine restoration project to protect coastal properties atop coastal bluffs in Malibu. Due to California regulatory restrictions, a traditional hard armor approach was not an option so alternative stabilization methods had to be considered.

DOWNLOAD PDF Applications & ProductsGeotextile Tube Containers, DewateringServicesTurnkey Project ManagementIndustryShoreline ProtectionLocationCalifornia, USA

OVERVIEW

In early 2009, engineers were tasked to design a marine restoration project to protect coastal properties atop coastal bluffs in Malibu. Due to California regulatory restrictions, a traditional hard armor approach was not an option so alternative stabilization methods had to be considered. The design team developed a concept utilizing 17’ circumference Tencate Geotube® containers to protect the toe of the bluff that would be installed below the high tide elevation. Above the waterline, Tencate Miramesh® was used to construct a wrapped face slope. In total, six 17’ circumference x 50’ long Geotube® containers with flat end technology were used to protect the 300’ of shoreline.

GEOTEXTILE CONTAINER SIZING

Geotube® containers are manufactured from high strength polypropylene fabric and designed to allow effluent water to escape through the pores of the fabric. It was determined that six tan Geotube® Containers with flat end technology would be used.

THE RESULT

As with the design, regulatory restrictions limited the construction methods and means that could be utilized during the restoration phase. When traditional hydraulic dredging was not accepted, the contractor chose a mechanical approach to fill the Geotube® containers. The contractor, PBA Limited, constructed a custom hopper that would allow dry sand to be shaken out of a bucket of an excavator into the 8” ports of the Geotube® containers. A 4” waterline was plumbed into the side of the hopper creating sand and water slurry that could easily flow down the length of the Geotube® containers. To minimize discharge during construction, some of the water used to operate the 4” pump was the re-circulated effluent generated during the filling process.