During a site visit it was discovered this Idaho municipality was not collecting solids in the geotextile tubes they were using. We put together a package of the equipment and polymer needed to get the operation running properly. The new site manager ordered the equipment and supplies along with the proper training to capture the solids in the tubes.
DOWNLOAD PDF Applications & ProductsGeotextile Tube Containers, Dewatering, EquipmentServicesComplete Solution, Turnkey Project ManagementIndustryMunicipalLocationIdaho, USA
This Idaho municipality had a technician dredging its lagoons. He didn’t have the proper equipment or the proper training on how to flocculate the biosolids in a geotextile dewatering process. The challenge was to provide the proper equipment, chemistry, and training to have the technician properly capture the biosolids.
A sample of the biosolids on this municipality’s lagoon was sent to the WaterSolve lab. Solve 216D was determined to have the best water release, clarity, and flocculation at the lowest dose.
Geotube® containers are manufactured from high strength polypropylene fabric and designed to allow effluent water to escape through the pores of the fabric while retaining the chemically conditioned solids. The space provided on site for dewatering allowed for 60’ circumference by 100’ long Geotube® container.
As a result of a site visit WaterSolve put together a proposal for the proper equipment and supplies to get this dewatering system back on track and operating effectively. A new manager took over the plant and ordered the package of equipment and supplies. He also requested a WaterSolve technician come to the site to assemble the system and train the dredge operator on how to manage the system. The WaterSolve technician assembled a polymer make-down unit with a 3” mixing manifold. An electric floating pump was provided to set on top of the lagoon to supply water to the make-down unit. This equipment was plumbed into the 3” dredge pipeline that delivered the biosolids to the geotextile tube. A sample port was also placed in the pipeline prior to the tube to provide visual observation of the flocculation. Adjustments were made to the polymer dose based on these observations. The dredge operator was amazed at the clean water exiting the geotextile tube when he attained the proper treatment. The Idaho plant operator was thrilled with the results of the upgrade.