Engineers had determined a sediment bowl around a water intake structure in Lake Erie was getting fill of solids. The structure helped prevent solids from getting into a pipeline as the water made its way 3 miles to the shore where it provided water to several cities. The objective of this project was to remove solids from the structure and dewater them for transfer to the shore as required by lake authorities.
DOWNLOAD PDF Applications & ProductsGeotubes® and PolymerServicesTurn Key DewateringIndustryIndustrialLocationOhio, USA
A representative sample of pond sludge was tested by a WaterSolve technician in the WaterSolve laboratory. Dewatering polymers were evaluated based on water release rate, water clarity, and flocculant appearance. In addition, dosing rate(s) were determined during bench-top testing. Solve 7118 followed by Solve 9330 was determined to flocculate and dewater this lake sediment most effectively.
Geotube® containers are manufactured from high strength polypropylene fabric and designed to allow effluent water to escape through the pores of the fabric while retaining the chemically-conditioned solids. The barge designated for this project allowed for a 30 foot circumference by 50 foot long Geotube® which has a maximum capacity of 99 cubic yards. The Geotube® was 15 feet wide and 50 feet long when it was deployed on the deck of the barge.
WaterSolve was contracted to provide the Geotubes®, polymer, chemical feed equipment, and a technician to manage the system on the barge while divers removed the solids from the intake structure. The Geotube® was placed on a grated floor made of pallets to allow water to seep out the bottom of the Geotube®. The WaterSolve technician installed a polymer feed system which injected the Solve 7118 (coagulant) followed by the Solve 9330 (flocculant). The Geotube® was secured on the barge with ropes tied to the straps of the Geotube® and some chains that reached across from side to side. Each day the barge was taken 3 miles out to the structure and secured. Once pumping started, the technician monitored the dose of chemistries and made sure the Geotube® was performing properly. Once the Geotube® was full of solids it was brought back to shore along a dock where a vacuum truck sucked the residual from the Geotube®. A new Geotube® was then placed on the barge to repeat the process. Divers were in the water for 3 hours at a time to gather the residual. The biggest challenge was choppy water. The barge operators were constantly monitoring the behavior of the water to make sure we could safely get to and from the structure. The divers successfully removed the residual from the structure and the dewatering process was a total success.