WWTP chose to dewater their residuals with WaterSolve’s chemistry and Geotube® system. The application was installed to provide for additional capacity during a period of time when weather conditions limited their ability to haul the sludge. The client was pleased with the results.

DOWNLOAD PDF Applications & ProductsGeotextile Tube Containers, DewateringServicesComplete Solution, Turnkey Project ManagementIndustryMunicipalLocationMichigan, USA

OBJECTIVE

The objective of this project was to process and manage the wastewater residual to pass a paint filter test for subsequent land application. A sample of the wastewater residual was tested the WaterSolve, LLC laboratory and tests revealed this would be a good application for Geotube® dewatering technology. A Geotube® container fabricated to fit into the existing drying beds and polymer feed system were installed in February of 2011 to manage residuals as a cost-effective dewatering method in order to accommodate the additional volume of residuals during a period of wet conditions in which it was not practical or permitted to land apply the residuals.

CHEMICAL CONDITIONING

A representative sample of the wastewater residual was tested by a WaterSolve technician. Dewatering polymers were evaluated based on water release rate, water clarity, and flocculent appearance. In addition, dosing rate(s) were determined during bench-top dewatering experiments and recommendations provided to the facility during this phase of the program. Solve 137 was the recommended polymer for dewatering this residual into Geotube® container.

GEOTUBE® CONTAINER SIZING

Geotube® containers are manufactured from high strength polypropylene fabric and designed to allow effluent water to escape through the pores of the fabric while retaining the chemically conditioned solids.  Based on field measurements, a 60’ circumference x 57’ length Geotube® container would fit into the drying beds.

THE RESULT

WaterSolve LLC was contracted by the facility to provide 60’ circumference by 57-ft long Geotube®containers, a polymer make-down and injection system, and technical support during the start-up of the system.  The initial Geotube® container was placed inside an existing drying bed.  A polymer make-down unit was plumbed into the piping designed to transfer the residuals to the drying beds. A drum of Solve 137 emulsion polymer was plumbed to the make-down unit. A sampling port near the Geotube® provided visual samples of the floc to determine changes needed to the polymer feed rate.