Gold deposits were first discovered at the Nevada mine in 1864. Over the years, mining operations have evolved to meet modern production and environmental standards. Before resuming new mining activities, the site required critical repairs to both the pregnant and barren pond liners to comply with updated regulatory requirements. Restoring the integrity of these liners was essential to ensure proper containment of process solutions, protect the surrounding environment, and support safe and sustainable gold extraction moving forward.

DOWNLOAD PDF Applications & ProductsGeotextile Tube Containers, DewateringServicesComplete Solution, Turnkey Project ManagementIndustryMining and Mineral ProcessingLocationNevada, USA

OBJECTIVE

Gold deposits were discovered at the Nevada mine in 1864. As the site prepared to resume operations, repairs to both the pregnant and barren pond liners were required to meet updated environmental regulations.

Before new liners could be installed, approximately 400 cubic yards of carbon fines needed to be dredged and dewatered from the barren pond. An 80-horsepower centrifugal hydraulic pump, mounted on floats, was used to dredge the fines and overcome nearly 500 feet of head to the designated lay-down area.

WATERSOLVE’S CONDITIONING CHEMICALS

A representative sample of the carbon fines was submitted to WaterSolve’s laboratory for bench testing. Dewatering polymers were evaluated based on water release rate, filtrate clarity, and flocculant performance.

Solve 9330 was selected for its excellent results and used to condition the fines during the dewatering process. Filtrate water from the Geotube® container was directed back to the pregnant pond to support efficient water management on-site.

GEOTUBE® CONTAINER SIZING

One 45’ x 100’ Geotube® container, constructed of high-strength polypropylene fabric, was used to dewater and contain the solids. The Geotube® allowed for the controlled release of water while retaining the conditioned carbon fines.

THE RESULT

Once sufficiently dewatered, the carbon fines were removed from the Geotube® container, packaged in super sacks, and shipped off-site for gold recovery. This solution allowed the Nevada mine to meet regulatory requirements and proceed with pond liner repairs, supporting safe and sustainable mining operations moving forward.