This industrial site was required to pump 250-gpm of water non-stop from a well on site. Caustic was added to raise the pH of the water from 4.6 exiting the well to 6.5 when it entered a waterway. This caused metals to precipitate and release into the waterway. A Geotube ® dewatering system has successfully captured the metals to put this industrial site in compliance and avoid violations to the discharge regulations.
DOWNLOAD PDF Applications & ProductsGeotextile Tube Containers, DewateringServicesComplete Solution, Turnkey Project ManagementIndustryIndustrialLocationTennessee, USA
This New Jersey industrial plant was no longer operational but was required to pump 250-gpm of water continuously from a well on site. The well water had a pH of 4.6 and caustic was added to raise the pH to 6.5. This caused the metals to precipitate out of the water and settle in the waterway at the point of discharge. The metals needed to be captured to avoid discharge violations at the site. WaterSolve LLC was called in to perform a pilot study to capture the metals with a Geotube® container and determine if this would be a cost-effective process to solve the problem.
A representative sample of the well water (adjusted to 6.5pH) was sent to WaterSolve’s lab prior to the project. Dewatering polymers were evaluated based on water release rate, water clarity, and flocculent appearance. In addition, dosing rate(s) were determined during bench-top dewatering experiments and recommendations provided to the facility during this phase of the program. Solve 137 was the recommended chemical treatment for dewatering this residual in a Geotube®. WaterSolve successfully ran tests using this Solve 137 under laboratory conditions and recommended it for a pilot study on site.
WaterSolve LLC was tasked to perform a pilot study to gather information and reveal the effectiveness of a Geotube® in collecting the precipitated residuals from the well water. Two WaterSolve technicians were present at this New Jersey industrial site to place a 20 cubic yard MDS GT500 Geotube® container in a dewatering dumpster and operate the system. A 3” electric pump was placed in the caustic mixing basin with a 3” hose transferring the basin water to the Geotube® container in the dumpster. A polymer make-down unit was equipped with a 0.58-gph LMI pump to regulate the polymer feed rate. The polymer was injected in the mixing manifold of the 3” line and a sample port was installed prior to the Geotube® to provide visual observations of the treated water for adjustments to the polymer feed rate. 250-gpm was transferred to the Geotube® container, and the polymer feed rate was 0.008-gph. The floc was like snowflakes inside the Geotube® container and the capture rate was excellent. In 22 hours of pumping there was 2 cubic yards of 11% dry wt. solids captured. The company was very pleased with the results, and they are now planning a full scale system to capture the metals and solve their problem very affordably using the Geotube® dewatering system from WaterSolve LLC.