This natural gas company was using hydro-excavation trucks to expose the pipelines to upgrade their system. They wanted to dewater and store the residual collected by the trucks in Geotube® containers to eliminate any runoff while the material was drying down. The Geotube® container storage of the material gave them safe storage without the worry of runoff until they determined where they would dispose of it.
DOWNLOAD PDF Applications & ProductsGeotextile Tube Containers, DewateringServicesComplete Solution, Turnkey Project ManagementIndustryIndustrialLocationTennessee, USA
This natural gas company was using hydro-excavation trucks to expose the pipelines to upgrade their system. They wanted to dewater and store the residual collected by the trucks in Geotube® containers to eliminate any runoff while the material was drying down. The Geotube® container storage of the material gave them safe storage without the worry of runoff until they determined where they would dispose of it.
A soil sample of the site was sent to the WaterSolve lab to determine the best chemical treatment program to dewater this material. Solve 163 was selected as having the best water release, clarity, and flocculation at the lowest dose.
Geotube® containers are manufactured from high strength polypropylene fabric and designed to allow effluent water to escape through the pores of the fabric while retaining the chemically-conditioned solids. A pad was designed to accommodate three 45’ circumference by 100’ long Geotube® containers. This would allow for a capacity of approximately 1,000 cubic yards of the residual. The actual volume to be removed was hard to determine prior to the project and this would allow extra room for the residual.
A sealed dumpster was positioned crossways and a ramp was made for the vacuum trucks to back up and release their loads. A 6” hydraulic pump was placed in the dumpster to pump the material to the Geotubes. A 6” pipeline was connected to the Geotube® containers with a mixing manifold to disperse the Solve 163 polymer being injected by the polymer make-down unit. A frac tank supplied water to the polymer feed system and provided dilution for the thick mud delivered to the dumpster. The loads contained 13 cubic yards of the residual sucked up by the vacuum trucks. This had to be diluted, pumped, and treated with Solve 163 on its way to the Geotube® containers. There were plenty of challenges with gravel, rocks, and chunks of mud throughout the project. Some of the gravel from digging through a parking lot had to be placed in separate loads as they could not be pumped. All three of the 45’ circumference by 100’ long tubes were filled at the end of the project. All the material was stored safely in the tubes and there was no worry about erosion or runoff.