358 Large Scale CCR Dewatering with Geotube® Containers
A large mid-western coal-fired power plant had accumulated almost 1.5 million cubic yards of coal combustion residuals in their ash lagoon.…
355 Geotextile Tubes Assist In Ash Pond Decommissioning
This ash pond at an electric power plant was scheduled to be cleaned and closed. The engineers on site anticipated the wastewater treatment…