284 Increasing Drying Bed Capacity and Function
The City of Heyburn, Idaho, Wastewater Treatment plant was running out of room in their drying beds to dewater Biosolids in the winter…
364 Dewatering Iron Sludge at a Water Treatment Facility
This municipal water treatment facility had a sediment vault that accumulated 18 inches of iron sludge over the course of 10 years, and it…
361 Algae Sludge from DAF to Geotextile Tubes
This municipality needed to remove the algae from the water entering the creek as it exited the lagoon wastewater system. They installed a…